Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Saturday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Recurrent and Windel get a nod for 400MWh Cumbria BESS
Energy Storage

Recurrent and Windel get a nod for 400MWh Cumbria BESS

solarenergyBy solarenergyJune 4, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A proposed site layout of the BESS project, showing the BESS containers on the right, connecting to the substation on the left. Image: Recurring energy / Windelenergie.

Cumberland Council has granted planning permission for a 200MW/400MWh BESS project from developers Recurrent Energy and Windel Energy, which will not start construction until 2029 unless a new grid connection date is agreed.

The two-hour Harker project is located between the villages of Todhills and West Linton on the outskirts of Carlisle and will be connected to the Harker National Grid Substation via an underground 400kV cable.

Construction is expected to begin in the fourth quarter of 2029, although transmission system operator (TSO) National Grid is currently assessing the acceleration of its grid connection, which could mean it comes online sooner, Recurrent said.

The approval of the building application follows a period of local consultation, according to Recurrent Energy. This included meetings with several key stakeholders, a dedicated project website, extensive landscaping to provide robust visual and noise mitigation, extensive acoustic fencing to limit noise impact, the provision of detailed battery storage FAQs and the implementation of a 23% net biodiversity gain target .

The site covers three fields totaling 6.4 hectares and will accommodate 162 battery energy storage systems (BESS).

Recurrent Energy is the project development arm of China and Canada-based PV module and BESS manufacturer Canadian Solar, and last week secured a £1.1 billion revolving credit facility for its global pipeline.

BESS’s e-Storage arm is already active in the UK market, signing an agreement with international utility and independent power producer (IPP) Engie in December for two separate 50MW/100MWh projects.

In other BESS industry news, this week we also saw the first BESS units arrive on site at a 150MW/300MWh project under construction by SSE Renewables, while developer NatPower last week announced plans for an earlier-stage 1GW BESS project in the North East -England.

See also  Solar Energy UK: Capping Solar and Bess risks £ 26 billion investment

Source link

400MWh BESS Cumbria nod Recurrent Windel
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025
Leave A Reply Cancel Reply

Don't Miss
Technology

Tornado rips through solar park in Florida – SPE

By solarenergyOctober 19, 20240

Duke Energy’s Lake Placid solar power plant suffered an EF-2 tornado during Hurricane Milton, shredding…

How to configure PV modules in broken solar plants

April 12, 2025

Turkish Startup develops Perovskiet-Organic Tandem Solar Cell Tech-PV Magazine International

April 4, 2025

Grid-scale storage in the US grows by 84%, residential storage by 48% – SPE

June 20, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025
Our Picks

Solar -Wafer prices have fallen 22.78% since April peak

June 7, 2025

China’s XYZ launches 261 kWh immersion-cooled commercial battery-PV Magazine International

June 7, 2025

Don’t let the Congress undo the energy progress of West Virginia

June 7, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.