Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Finance - RES wins contract for 70MW solar plus storage location
Finance

RES wins contract for 70MW solar plus storage location

solarenergyBy solarenergyDecember 17, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The Larks Green project features a 99 MWh battery energy storage system. Image: Cero Generation/Enso Energy.

Renewable energy developer RES has won an asset management contract for a 70MW solar plus storage project near Bristol.

RES already provides operation and maintenance services to the solar power plant and has been the asset manager for about a year. It will now also manage the battery energy storage system (BESS) to monitor operational performance.

The Larks Green project, owned by developer and independent power producer (IPP) Cero Generation, became the first of its kind to be connected to the transmission network in Britain, the company claimed.

Larks Green includes 70 MW of solar PV generation and a 49.5 MW/99 MWh co-located battery energy storage system (BESS). The project has a 120MW grid connection, which acts as a commercial manager Patrick O’Connor told it Energy storage.newsmeans “the BESS does not compete with solar energy for export capacity”.

Robert Mattholie, Head of Solar and Storage Asset Management, Northern Europe at RES, said: “As Britain accelerates its shift to net zero, projects like Larks Green underline the importance of integrating advanced technologies with experienced partners to deliver sustainable energy to deliver. solutions.

“This project demonstrates the potential of co-located renewable energy and storage systems to boost Britain’s energy resilience. We are excited to work with Cero Generation to ensure Larks Green operates efficiently and reliably and sets a benchmark for the future of renewable energy infrastructure.”

Rabobank financed both the BESS and the solar PV elements. Cero Generation and its UK development partner Enso Energy said work on the project has established long-term partnerships with Canadian Solar, the battery engineering, procurement and construction (EPC) leader, and EDF, the battery performance optimiser.

See also  California landslide victims get emergency solar and solar energy storage

To connect the solar PV installation to the transmission network, Cero and Enso, in collaboration with National Grid, installed new switchgear at the site. A high-voltage cable also connected the solar farm to the Iron Acton substation near Bristol.

The Enso-Cero partnership was originally signed between Enso and Macquarie’s Green Investment Group (GIG), before GIG launched Cero and consolidated its existing and future European solar business, including the UK pipeline, into the new developer.

Source link

70MW contract location RES solar storage Wins
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

UK government considers community grant for battery storage

June 5, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

France publishes new provisions making solar energy mandatory in car parks – SPE

By solarenergyNovember 18, 20240

France has issued provisions mandating solar installations in car parks, detailing calculation methods, exemptions and…

‘Lack of awareness’ is holding back solar energy in the community

June 8, 2024

The battery storage fleet of Germany sets to 19 GWH – PV Magazine International

January 31, 2025

Statera Energy, ILI Group Land Planning agrees

August 29, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.