Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Scotland publishes new guidance to support BESS project planning
Energy Storage

Scotland publishes new guidance to support BESS project planning

solarenergyBy solarenergyMarch 21, 2026No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Scottish Government has published new planning guidance to help applicants, decision makers and others involved in the implementation of battery energy storage systems (BESS) projects.

The new guidance specifically refers to the planning process of network-scale BESS projects under the Town and Country Planning (Scotland) Act 1997, and the Electricity Act 1989 in relevant cases.

The guidance will prepare applicants for the planning process to ensure a BESS site is appropriately sited and designed in the early stages of development. To assist Scotland’s BESS industry, the guidance also summarizes the relevant legal requirements.

“Battery energy storage systems will play a role in Scotland’s transition to a low-carbon, resilient and efficient energy system by supporting the stability of the electricity grid,” said Ivan McKee, Chancellor of the Exchequer.

“This new planning guidance will support all parties in the planning process. It recognizes that BESS remains an evolving sector, with few operational sites and the potential for battery technologies to change in the future.”

Related:Energy plans form 10MW/1,000MWh BESS in Ireland

The guidance does not change existing planning policy or regulations in Scotland and does not serve as a list or overview of all potential issues that may arise when planning a BESS site.

The government’s announcement states that applications for energy infrastructure will be assessed on a case-by-case basis. Applications are assessed based on relevant policy and existing legislation, the individual context of the location, consultation and public input.

In accordance with UK NSIP guidelines

The guidance addresses several features of the policy framework and decision-making considerations that BESS planners may consider noteworthy.

See also  Italy adds 1.74 GW in January-October period and reaches a record 12 GWh of energy storage – SPE

For proposals of 50 MW or less, the guidelines refer to the already existing document Planning Circular 3/2022: Development Management Procedures, which goes into more detail about the procedures behind a processed application. These depend on whether the regulations consider a proposal to be a ‘national’, ‘major’ or ‘local’ development.

  • National developments, found in National Planning Framework 4 (NPF4), indicate major developments “of national importance” for Scotland. NPF4’s National Development 3 includes the storage of renewable electricity with a capacity of more than 50 MW

  • Major developments are defined in Schedule 1 of the Regulations and include BESS of 20 MW or greater

  • Local developments include all other developments not classified as National or Major

The guidelines bring Scottish policy in line with Great Britain’s Nationally Significant Infrastructure Projects (NSIP), which focus specifically on England and Wales.

Related:Scotland’s First Minister visits the site of the country’s first domestic battery factory

Promoting cooperation

The Scottish Government’s announcement highlights that the guidelines are intended to promote collaboration between BESS planners, consultants and the public.

Best practice dictates that applicants should liaise with the Scottish Fire and Rescue Service (SFRS) at an early stage in the development of the proposal; however, they are not a mandatory consultation. If a site proposal is not in accordance with the SFRS proposed NFCC guidelines and other relevant requirements, a decision maker may review the application accordingly.

The guidelines note that some project information may be immutable depending on technology and operational details. Nevertheless, BESS applicants are encouraged to be transparent about the project’s location, scale, appearance and impact on the environment and local features.

See also  CATL wins world's largest order for sodium-ion batteries from Hyperstrong – SPE

Applicants are further discouraged from finalizing the layout of the BESS site before permission has been granted. If they need to adjust expectations, best practice recommends transparency in communicating the change and its cause, and collaboration with the decision maker on the terms.

Environmental planning

Related:Gore Street Energy Storage Fund to sell more UK assets

The guidelines encourage applicants to consider the environmental impacts of their project, taking the natural landscape into account when designing a project and during site selection. Best practice includes selecting sites with minimal visibility, such as brownfield sites, and avoiding open, exposed spaces where development will mask the landscape.

Applicants must also consider the aquatic environment from the initial stages. This includes considering local water bodies, flood risks, drainage, groundwater, wetlands, peat and carbon-rich soils and any pre-existing infrastructure.

In addition, applicants must take into account the noise emissions that BESS sites produce due to the systems and equipment, especially as they operate 24/7. It identifies common noises as a “tonal hum” or a “buzz” that can cause ambient noise pollution in quiet, rural areas or contribute to noise pollution in industrial areas.

The National Planning Hub, a Scottish Government-led initiative to support planning authorities with decision-making, commissioned the new guidance. It was prepared by Ironside Farrar, an independent environmental consultancy, with input from others including:

  • The Scottish Environmental Protection Agency (SEPA)

  • The Scottish Fire and Rescue Service (SFRS)

You can find the full guidance here.



Source link

BESS guidance planning project publishes Scotland support
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

UK government considers community grant for battery storage

June 5, 2026

UK CfD scheme provides optimism for the UK investment landscape

June 5, 2026

Fidra Energy buys 1GW BESS from Innova

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Grid operators can reduce renewable energy penetration if data center growth continues unchecked, says ENTSO-E – SPE

By solarenergyMay 9, 20260

A new report from the European Network of Transmission System Operators for Electricity examines the…

New Koelgel can increase the efficiency of PV module by 12% – PV Magazine International

June 9, 2025

Otovo will acquire EnergyAid and its solar subscription model

March 3, 2026

Jinkosolar takes the top spot on WoodMAC’s list of PV module manufacturers

January 26, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.