Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Finance - Statera reaches financial close on £395m development
Finance

Statera reaches financial close on £395m development

solarenergyBy solarenergyNovember 5, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The £395 million financing package for the Thurrock project (pictured) was provided by a syndicate of six major banks. Image: Statera Energie

Energy storage developer Statera Energy has announced that it has secured a total of £395 million in funding for a major battery energy storage system (BESS) and generation project.

The Thurrock Flexible Generation project, which consists of a 300MW/600MWh BESS and a 450MW flexible generation development, has now reached financial close via debt facilities provided by a syndicate of six energy and infrastructure finance banks. The banks involved include household names including Lloyds Bank, which acted as the structuring bank for the deal, alongside Natixis, NatWest, Santander, SEB and Siemens Financial Services through Siemens Bank.

Statera Energy completed a £144 million debt financing deal in November 2023 and has now secured a further £251 million, bringing its total debt facility to £395 million. The syndicate’s financing takes the form of a term loan, a VAT facility and a liquidity facility.

Construction and development work on the project is already in full swing and the storage portion of the project is expected to be activated before the end of this year. Once completed and powered, Thurrock Storage will be the largest operational BESS in Britain; according to Statera, it has three times the capacity of the country’s second largest operational BESS. Initial construction work on the flexible generation portion of the project began earlier in the fall; an expected connection date has not yet been announced.

Statera’s founder and CEO Tom Vernon thanked the financial syndicate and optimization partner Statkraft, adding: “The size of this financing represents a significant milestone for Statera. Once operational, these will be the largest battery and flexible generation projects in Britain, at 600 MWh and 450 MW respectively. Thurrock Power and Thurrock Storage will provide the critical grid balancing capacity needed to support the UK’s transition to a renewable energy-based energy system.”

See also  Croatia plans solar tenders in 2025 – SPE

Representatives from the various banks in the syndicate expressed their excitement at the development, with NatWest’s director of specialist asset and project finance Oliva Satturley noting that “financing assets such as Thurrock Storage and Thurrock Power remains vital for the UK to achieve a enable greater flexibility and resilience. the UK grid”, and director of specialist and project finance at Santander UK, Jonathan Corcoran, who called the project “a perfect example of how we help businesses thrive”.

Another big win for Statera Energy

The completion of this financing agreement is the latest cause for celebration in what has been a strong year for Statera Energy.

In early August, Statera Energy secured planning permission for a major BESS development in Weymouth, the 400 MW/2,400 MWh Chickerell BESS. Despite local concerns about fire danger, neither the Dorset & Wiltshire Fire and Rescue Service nor the Environment Agency objected to the development of the six-hour BESS. This project will not be connected to the electricity grid until 2028 at the earliest, although this date may be postponed due to its size.

In March, the company was given the green light for another project in south-west England, a 290 MW/1,740 MWh project near Exeter, East Devon. Notably, this is also a six-hour project, while most UK developments are one or two hour systems. The Exeter BESS is expected to be connected to the electricity grid in 2027.

Meanwhile, in Oxfordshire, Statera has submitted a planning application for a 500MW BESS at the Culham Campus science facility, home to the UK Atomic Energy Authority (UKAEA). If approved, the plan would support the expansion of UKAEA’s research facilities on campus.

See also  Perovskiet-Silicon Tandem solar cell built with hybrid mescoating reaches 27.8% Efficiency PV Magazine International

Source link

395m close development financial reaches Statera
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Forest Gate: a case study in shared community property

June 4, 2025

Perovskiet-Silicon Tandem solar cell built with hybrid mescoating reaches 27.8% Efficiency PV Magazine International

June 3, 2025

Inaccurate limitation prognoses could derail British solar projects

May 27, 2025
Leave A Reply Cancel Reply

Don't Miss
Technology

New BIPV concept integrates slats to improve energy production – SPE

By solarenergyJanuary 22, 20250

Scientists have proposed a building-integrated PV system that integrates airflow to cool the panels and…

Freyr will acquire American production assets from Trina Solar

November 9, 2024

Nord/LB will invest €73 million in a 100 MW Polish solar park – SPE

December 12, 2024

Helmholtz-Zentrum Berlin affects 24.6% efficiency for perovskiet-Cigs-Cel

February 5, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025
Our Picks

Brazil Solar Import slow as new Chinese trade routes open

June 6, 2025

Anker Solix launches F3000 Portable Power Station for Homeback Use – PV Magazine International

June 6, 2025

HoarFrost-inspired technology to improve MPPT in PV systems under partial Shadow-PV Magazine International

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.