Browsing: Zenobē
Zenobē received the first Gate 2 Phase 1 connection offer, the company’s public affairs and policy leader Georgina Morris-Rowbottom announced…
Energy storage company Zenobē is currently legally challenging the LDES (Long Dur Energy Storage) cap program, claiming it unfairly favors…
Battery Energy Storage System (Bess) Owner and Operator Zenobē has announced that it has taken over a Bess project from…
“The scheme gives LDES an unfair advantage because they will compete in the same markets with subsidized lower capital costs,”…
A 3D mockup of the Eccles Bess project. Image: Zenobe. Battery Energy Storage System (Bess) Developer/Operator Zenobē has announced that…
The Blackhillock storage (depicted) adds more than 30% to the operational battery capacity of Scotland. Image: Zenobē. Zenobē announced today…