Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - The first co-location project in Great Britain is connected to the transmission network: Solar Power Portal
Energy Storage

The first co-location project in Great Britain is connected to the transmission network: Solar Power Portal

solarenergyBy solarenergyNovember 13, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
To connect the solar PV installation to the transmission network, new switchgear was installed at the site by Cero and Enso in collaboration with National Grid. Image: Cero Generation.

Developer and independent power producer (IPP) Cero Generation has connected its Larks Green solar and storage facility to the UK transmission network.

The 70MWp solar PV portion of the project was completed in April 2023, becoming the first standalone solar PV installation to be connected to the transmission network. Powering the 49.5MW/99MWh Battery Energy Storage System (BESS), located adjacent to the solar development, makes the facility the first of its kind with a transmission link in Britain.

The project has a 120MW grid connection, which acts as a commercial manager Patrick O’Connor told it Energy storage.newsmeans “the BESS does not compete with solar energy for export capacity”.

Marta Martinez Queimadelos, CEO of Cero Generation, who said she was “delighted” to have reached this milestone, explained: “This co-located solar and battery storage project will make it possible to supply power to the grid when is needed, linking demand and generation. The development of these projects will help reduce energy costs for households while reducing Britain’s dependence on fossil fuels.”

Rabobank financed both the BESS and the solar PV elements. Cero Generation and its UK development partner Enso Energy said work on the project has established long-term partnerships with both Canadian Solar, as a leader in battery engineering, procurement and construction (EPC), and EDF, as battery performance optimization.

To connect the solar PV system to the transmission network, Cero and Enso, in collaboration with National Grid, installed new switching equipment at the site. A hA high-voltage cable also connected the solar farm to the Iron Acton substation near Bristol.

See also  NC Orchard installs Solar to meet 75% of energy needs on site

The Enso-Cero partnership was originally signed between Enso and Macquarie’s Green Investment Group (GIG), before GIG launched Cero and consolidated its existing and future European solar business, including the UK pipeline, into the new developer.

On November 11, Solar energy portal reported that National Grid had completed upgrades to its Drax 132kV substation to enable the transmission link of TagEnergy’s 100MW/200MWh BESS.

According to the renewable energy developer, the North Yorkshire facility is the largest transmission-linked battery storage system in Britain.

A connection to the high-voltage transmission system, rather than to a local distribution network, means that the energy generated at a site or discharged from a battery can be transported over greater distances.

Source link

Britain colocation connected Great network Portal power project solar transmission
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

New research sheds light on intrinsic limitations of selenium solar cells

By solarenergyApril 15, 20250

Danish researchers have analyzed fundamental material properties of Selenium solar cells and have discovered that…

CATL unveils 6.25 MWh energy storage system TENER

April 30, 2024

Statera Energy secures financing for 680MW BESS

November 7, 2025

Aspen Power Completes First ITC Solar Transfer Agreement

September 21, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.