Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Free Digital Tool Streamlines the Lay -Out Plan for Solar Storses On The Roof

June 5, 2025

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025

Eternal Sun acquires Wavelabs – PV Magazine International

June 5, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, June 5
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - The municipality grants RPC and Greenfield permission for 40MW BESS
Energy Storage

The municipality grants RPC and Greenfield permission for 40MW BESS

solarenergyBy solarenergyJanuary 22, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
In similar news, renewable energy company RES’s 45MW BESS near the Alness substation in Scotland has also been approved. Image: RES.

Renewable Power Capital (RPC) and Greenfield have been granted planning permission for their second battery energy storage system (BESS) in the UK.

The 40 MW BESS will be located in Tredington, Warwickshire, and will be connected to the distribution network. It comes after the companies, under a partnership agreement, secured planning permission for a separate 22.8MW BESS project called Steventon.

Both projects have been designed with a view to improving the natural habitat at the sites. In Tredington, an increase of 21.33% for surface habitat units and 191.51% for hedgerow units is proposed and Steventon will see a net biodiversity gain of 30.73% habitat units and 62.36% hedgerow units.

Construction of both projects is expected to take between six and 12 months. RPC, headquartered in London, acquired both BESS projects from Greenfield in May 2023, when the two signed a development agreement. The companies aim to bring 500 MW of battery storage projects to the ready-to-build phase.

RPC was launched in December 2020 by Canada Pension Plan Investments (CPP Investments), a state-owned pension investment fund.

At the time of the partnership announcement, no details were given about the Tredington or Steventon BESS. It followed RPC’s first foray into the UK market through a joint venture with battery storage company Eelpower. Shortly after the collaboration with Greenfield, RPC signed a new joint venture with Spain-based renewable energy company Elmya Energy.

RPC CEO Kevin Devlin said receiving planning permission was a “real milestone” for the company, having only been active in the GB storage market since last year. He added that the government’s Clean Power 2030 plan has been a “positive signal” for investors and that the company sees “huge growth potential for energy storage” in Britain.

See also  ILI Group has granted consent for 100 MW Ayrshire BESS

RES Alness BESS receives permission

In similar news, renewable energy company RES’s 45MW BESS near the Alness substation in Scotland has also been approved.

RES says it has developed more than 830 MW of energy storage projects in the UK and Ireland. At the very top of this year, it has submitted a planning application for a 100MW BESS to Fermanagh and Omagh District Council in Country Tyrone, Northern Ireland.

The Alness facility is RES’s second project to move forward this week, after the company opened a second round of consultation on a solar plus storage development for Nottinghamshire. RES has a grid connection agreement for up to 600 MW of combined solar and battery energy storage, but distribution between solar and associated battery components has not yet been completed.

Source link

40MW BESS grants Greenfield municipality permission RPC
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025

National Battery Storage Safety Standard to ‘speed up’ implementation

June 5, 2025

1Momma5 ° unveils VPP-ready solar sun, battery solution-PV Magazine International

June 5, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Offshore floating PV system based on a two-axis tracker and a tension leg platform

By solarenergyMay 7, 20240

The HelioSea system, developed by scientists in Spain, can reportedly ensure structural reliability in challenging…

‘Gender equity benefits Everyone in the workplace’ – PV Magazine International

March 16, 2025

Dutch Startup develops a large plant to generate heat, capacity of hydrogen – PV Magazine International

March 19, 2025

The objectives of Earth Day are impossible without energy storage

April 23, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Free Digital Tool Streamlines the Lay -Out Plan for Solar Storses On The Roof

June 5, 2025

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025

Eternal Sun acquires Wavelabs – PV Magazine International

June 5, 2025

Republican Senator Pens Op-ED looking for a more measured approach to IRA changes

June 5, 2025
Our Picks

Free Digital Tool Streamlines the Lay -Out Plan for Solar Storses On The Roof

June 5, 2025

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025

Eternal Sun acquires Wavelabs – PV Magazine International

June 5, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.