Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Commercial & Industrial - Tigo Energy installs 90-kW solar system at California headquarters
Commercial & Industrial

Tigo Energy installs 90-kW solar system at California headquarters

solarenergyBy solarenergyApril 27, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Tigo Energy now hosts a 90-kW solar system atop its headquarters in California. The system was designed and deployed by Laibach Solar. The system is equipped with 180 Tigo TS4-A-O MLPE devices, the Tigo Access Point (TAP) and the Tigo Cloud Connect Advanced (CCA) data logging device.

The 90-kW system design, which includes 180 500-W solar modules and a Solectria inverter, had to overcome significant shading challenges from existing roof features. By deploying its own technology, the performance of the system on the Tigo headquarters will only be minimally impacted by shading throughout the day and be further boosted by Tigo Reclaimed Energy technology. Tigo will also benefit from module-level monitoring and advanced rapid shutdown safety measures to protect solar professionals, building maintenance personnel, and first responders.

“We have used Tigo products on many projects over the years because of the quality and design flexibility they deliver, and it was great to design a system for the Tigo headquarters where we were able to overcome shading constraints from the barrier wall structures with their own technology,” said Dejan Obradovic, owner at Laibach Solar. “While this system is clearly something of a crown jewel for us as a solar installation company, there is no doubt that the pressure is also on, which is why we are using the Energy Intelligence monitoring platform and Tigo EI Professional to keep an eye on things.”

With the Tigo Energy Intelligence monitoring platform, Laibach Solar and Tigo Energy have full control and visibility over the installation. This platform not only allows Tigo to monitor reclaimed energy and shading occurrences but also provides optimization insights, ensuring the system operates at its peak efficiency. The Tigo Energy Intelligence Portal gives insight into reclaimed energy, or the amount of energy that would have been lost due to shading and any module mismatch. On typical sunny days, the rooftop system at the Tigo headquarters is projected to reclaim an average of approximately 14 kWh daily.

See also  Your guide to transitioning to solar in Colorado Springs

“I want to thank the team at Laibach Solar for the great system design and a very high-quality installation, particularly as it relates to overcoming a tricky combination of shading and permitting constraints,” said Jing Tian, chief growth officer at Tigo Energy. “With the setup we have today, our solar output is being optimized to give us the best possible gain in the form of Reclaimed Energy, which helps us constantly shave off of the power demand we would have for the grid. This system is exactly the kind of result that a commitment to Total Quality Solar can produce.”

News item from Tigo

Source link

90kW California Energy headquarters installs solar system Tigo
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

China reviews anti-dumping duties on solar silicon from the US and South Korea

By solarenergyJanuary 13, 20250

The Chinese government says it will review 2014 anti-dumping duties on polysilicon imports from the…

Project planning receives a reality check after OBBB

July 23, 2025

KGAL invests in a 1 GW green hydrogen hub in the Baltic Sea – SPE

September 24, 2024

White Pine Renewables Inks deal for projects in Calif. | Solar financing Spotlight

February 18, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Our Picks

A deep learning model tracks the status of the EV battery with high precision

March 6, 2026

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.