Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - University of Denver partners with Pivot Energy for 23 MW of solar energy
News

University of Denver partners with Pivot Energy for 23 MW of solar energy

solarenergyBy solarenergyApril 24, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
Part

Turn energy and the University of Denver (DU) collaborate to build on-campus solar facilities and off-site net metering solar projects, totaling more than 23 MWDC.

Solar field installation located in Palisade, Colorado. Credit: Pivot Energy

DU will use renewable energy generated by solar facilities owned and operated by Pivot Energy, allowing the university to offset total campus electricity consumption with clean solar energy, paving the way for its goal of carbon neutrality. In 2008, DU was one of the first universities to join the American College and University Presidents’ Climate Commitment to achieve carbon neutrality. To date, fewer than 24 colleges and universities have achieved carbon neutrality.

Pivot Energy will develop a total of seven projects. The 1.2 MW solar system will be located in the Ritchie Center, increasing on-site clean energy to 10% of the university’s energy consumption. This is an expansion of DU’s 2019 solar installation project with Pivot on 18 different buildings with a total capacity of 2.2 MW.

In addition, there will be six off-site net metering solar projects totaling 22.2 MW that will produce enough clean energy to eliminate 100% of scope two greenhouse gas emissions, allowing DU to reduce half its carbon footprint . The projects will take place in Larimer, Adams, Mesa and Weld counties and will take 24 to 36 months to complete. They will then be used to teach students to provide additional pathways to advance the clean energy workforce of the future.

“The university’s goal of achieving carbon neutrality will be achieved through our unwavering determination to build a better world and a better future for our students,” said DU Chancellor Jeremy Haefner. “When I was appointed Chancellor at DU, I made a commitment to achieve carbon neutrality by 2030. I am pleased that we can continue our partnership with Pivot Energy to work towards achieving this goal.”

See also  Sunrun is launching a new subscription to solar energy/storage that 'bends' with changing electricity needs

“Pivot Energy is excited to continue our partnership with DU to help achieve their clean energy goal,” said Mat Elmore, SVP Strategic Accounts at Pivot Energy. “By utilizing on-campus solar installations and off-site net metering solar projects, DU is establishing itself as a higher education institution leading the way in sustainability and advancing the clean workforce energy.”

In 2021, legislative leaders, including Colorado Senate President Steve Fenberg, passed Senate Bill 261, which created an off-site net metering program to allow more flexible access for customers interested in installing solar energy to reduce their energy consumption compensate.

News item from Pivot

Source link

Denver Energy partners Pivot solar University
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Britain’s next energy dependency is already taking shape

June 5, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Policy

Net meetings are sweeping the country. This is how sun companies can prepare

By solarenergyFebruary 10, 20250

Net measuring policy shifts throughout the country and solar installation companies have the right to…

ProScore launches IRA compliance software

November 22, 2024

‘Without storage of energy, renewable energy sources are not serious power plants’ – PV Magazine International

March 24, 2025

NJBPU opens third application of the program Competitive Solar Incentive (CSI))

April 24, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.