Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Viridi replaces New York’s municipal diesel generator with battery
News

Viridi replaces New York’s municipal diesel generator with battery

solarenergyBy solarenergyFebruary 19, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Viridi has implemented a battery energy storage system (BESS) at a wastewater pumping station in Erie County Sewer District No. 2 in Hamburg, New York. The project strengthens public infrastructure while reducing operating costs and diesel emissions, while replacing traditional backup generators.

The RPSLink BESS was installed to replace a diesel generator in Erie County Sewer District No. 2 in Hamburg, New York. Viridi

Wastewater pumping stations are critical to public health, but typically rely on diesel generators that require regular testing, fuel treatments and ongoing maintenance, despite being infrequently used.

Viridi’s solution offers a safer, more cost-effective and sustainable alternative. The newly installed 150 kWh RPSLink BESS provides 32 to 90 hours of reliable backup power, depending on pump demand, and ensures continuous operation during outages, without the fuel consumption, emissions or maintenance of diesel generators.

“By replacing the aging diesel generator with a Viridi battery-powered energy storage system, we eliminate fuel dependency, expect to see a reduction in maintenance costs, and achieve near-instant backup power, all while aligning nicely with Erie County’s ongoing climate and energy goals,” said Angela M. Horton, PE, senior sanitary engineer for the Erie County Division of Sewerage Management. “This transition will not only reduce our emissions, but we also expect improvements in the reliability and resiliency of these critical wastewater pumping operations. Although the Viridi system has only recently been installed, we are very optimistic about its future impacts.”

The Viridi BESS is supported by real-time monitoring designed to reduce the number of trucks, detect system problems and increase the reliability of wastewater operations. Erie County’s commitment will serve as a model for future installations in a region with nearly 100 similar pump stations.

See also  Ecoflow launches the stackable battery system in Australia - PV Magazine International

“This project shows what is possible when public infrastructure embraces safer, smarter and more sustainable energy technologies,” said Jon M. Williams, CEO of Viridi. “Wastewater pumping stations are essential to public health, but have been powered by the same diesel-based systems for decades. Our flawless BESS offers municipalities a cleaner, more reliable and more economical path forward – one that protects both residents and the environment.”

News item from Viridi

Source link

battery diesel generator Municipal replaces Viridi Yorks
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Financial close of Fidra Energy’s 500MW battery energy storage

July 20, 2026

Battery storage developers win 81% of planning applications in England

July 17, 2026

Alfen and CATL will implement 5 GWh sodium-ion battery storage in Europe

July 17, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

STEM: Project of the Year 2025 | 101 kW to 1 MW

By solarenergyOctober 2, 20250

By SB staff September 30, 2025 Here are the nominees from 101 kW to 1…

JinkoSolar supplies 3 GW of modules in Saudi Arabia

October 17, 2024

How SiteCapture reduces costs for solar companies with AI | The pitch

May 3, 2026

MET Group completes 23.4 MW of solar energy in Hungary – SPE

August 31, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.