Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Wärtsila releases new battery on a large scale – SPE
Technology

Wärtsila releases new battery on a large scale – SPE

solarenergyBy solarenergySeptember 5, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Finland’s Wartsila Energy has released a new turnkey battery energy storage system (BESS) with new fire safety features.

September 5, 2024 Ev Foley

By ESS news

Fire safety is a key feature of Wärtsilä Energy’s new Quantum3 BESS, alongside upgrades in cybersecurity, energy density and sustainability.

The Finland-based company’s AC block BESS builds on the Quantum2 model, which has undergone nearly 10,000 hours of fire safety testing, including fire extinguishing water and plume gas research.

Wärtsilä said the Quantum3 meets the changing needs of customers and markets for network-scale energy storage, including Australia.

Wärtsilä Energy Storage and Optimization Vice President Andrew Tang asserted that the features will help strengthen the confidence of customers, local communities and first responders that “Wärtsilä’s systems will stand the test of time.”

Quantum3 is a complete AC block solution, with fully integrated batteries and string-based power conversion systems (PCS). String inverters enable decentralized control to improve system availability, efficiency and reliability throughout its life cycle.

The BESS also features Wärtsilä’s proprietary Battery Management System (BMS), which was designed and developed in the United States.

Wärtsilä’s BMS provides efficient cell balancing, customizable system management and enhanced cybersecurity, informed by Wärtsilä’s insight into battery performance and on-site system management.

Housed in a 20-foot ISO container with single-side access, the Quantum3 BESS is ready for worldwide shipping and allows for on-site deployment and back-to-back configuration. The sustainable design includes low noise levels and a low global warming potential (GWP) cooling system.

The Quantum3 is powered by Wärtsilä’s machine learning GEMS digital energy platform (EMS) and uses string inverters to provide visibility and control from battery to fleet level.

See also  Brill Power launches the world's first battery management as a service plan

Quantum3 can intelligently manage energy supply during peak hours, reducing operating costs and meeting additional service needs. It streamlines controls from the BMS to the EMS, ensuring high data accuracy and better access to improve performance and reduce downtime.

Wärtsilä Energy will add 240 MW/1,030 MWh in the second phase of Origin Energy’s Eraring power station battery facility, increasing total capacity to 700 MW/2,103 MWh. The company was also chosen for the first phase of the project.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

battery large Releases scale SPE Wärtsilä
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Financial close of Fidra Energy’s 500MW battery energy storage

July 20, 2026

Battery storage developers win 81% of planning applications in England

July 17, 2026

Alfen and CATL will implement 5 GWh sodium-ion battery storage in Europe

July 17, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Mexico could become a data center hub, but clean energy is lagging behind – SPE

By solarenergyFebruary 18, 20260

Mexico is attracting US data centers looking for faster power connections, but these facilities will…

Solar energy projects could become 30% more expensive | This is why companies must act quickly

May 6, 2026

South Korea introduces standards for photovoltaic-thermal modules

October 30, 2025

‘Technical expertise is often questioned more severely when demonstrated by women’ – SPE

January 19, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.