Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Finance - NESO removes ‘cumbersome administrative burden’ for distribution connections
Finance

NESO removes ‘cumbersome administrative burden’ for distribution connections

solarenergyBy solarenergyJanuary 16, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The TIA process is costly and delays or blocks local energy projects over 1 MW in size. Image: Keith Edkins via Wikimedia Commons.

The UK National Energy System Operator (NESO) has put forward a proposal that would increase the transmission impact assessment (TIA) threshold from 1 MW to 5 MW.

The proposal has been put forward as an urgent change in the hope that the change, CMP446: Increasing the lower threshold in England and Wales for the assessment of TIA, can be implemented before the grid connection reforms promised for this year .

If approved, it could also help to facilitate the new connection process, proposing that projects below the lower end of the TIA thresholds would not have to go through the Gate 2 process.

National Grid Electricity Transmission (the transmission owner for England and Wales) initially proposed the change, Shraiya Thapa of law firm Freeths told our sister site Current± in one recent interview. Nasty read more about the ongoing grid connection reformsvisit Current±.

According to NESO, “implementing this change before the Gate 2 window opens will free approximately 400 distributed generation projects from the need to demonstrate Gate 2 compliance or alignment with Clean Power 2030 goals.”

The current TIA process has been criticized for being costly and delaying or effectively blocking local energy projects of more than 1 MW. Solar industry trade body Solar Energy UK has “warmly welcomed” the news that “a burdensome element of red tape has added many years to getting projects off the ground”.

The move has come sooner than expected, SEUK said, and will contribute to the “solar roof revolution” that Energy Minister Ed Miliband has promised. The change will only bring changes in England and Wales, but “a similar but less radical” change has already been made in Scotland.

See also  Neso opens plans for strategic energy planning framework

Last summer, Scottish and Southern Electricity Networks (SSEN) increased the threshold for TIAs from just 50 kilowatts – around twelve times the size of a typical domestic installation – to a more substantial 200 kW. This significantly accelerated 35 projects in central and northern Scotland, with a capacity of 5.2 MW.

Chris Hewett, CEO of SEUK, said: “Reducing barriers to sustainable energy is always a welcome step, so we welcome NESO’s announcement today, which has come slightly earlier than we expected. Reducing red tape for large-scale roof projects, and potentially for small-scale ground-mount systems, will be a real economic boon.”

The announcement should significantly accelerate the deployment of photovoltaic solar energy, especially in warehouses. Two years ago, the UK Warehousing Association, working with Solar Energy UK, estimated that the sector could install 15 GW if grid problems were resolved.

Source link

administrative burden connections cumbersome distribution NESO removes
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

NextEnergy’s Starlight Energy secures 240MW/960MWh BESS consent

July 13, 2026

Quinbrook announces the closure of the second UK Renewables Impact Fund

July 9, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Equity Solar Illinois controls ComEd area’s first community solar and storage project

By solarenergyNovember 4, 20250

Equity Solar Illinois has announced the endorsement of Ducks Solar, the first community solar project…

BIPV for pilot projects with prefabricated net-zero homes in Australia – SPE

September 28, 2024

‘Raster-forming technology is no longer experimental it is here and works’ PV Magazine International

July 7, 2025

Worldwide module prices to keep stable in the midst of mixed sentiments

February 15, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Flexibility as an asset

July 22, 2026
Our Picks

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.