Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Manufacturing partnership brings new PV technology to US solar

April 23, 2026

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Qair lands permission for 49.9 MW Bess
Energy Storage

Qair lands permission for 49.9 MW Bess

solarenergyBy solarenergyJuly 27, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Green Switch Capital, part of the Qair Group, has announced that it has protected a building permit for the first independent Battery Energy Storage System (BESS) project.

The Middleton Farm Energy Storage Facility has a capacity of 49.9 MW and will be on about 1.3 hectares of land on Middleton Farm, near Potterdown, Aberdenshire. After an extensive planning process in which Green Switch Capital was supported by Locoge, AberDeenshire Council on 1 July approval for the project.

To reduce the visual impact of the development, the Bess units are painted green so that they can merge into the surrounding landscape. In addition, a considerable amount of improvements of biodiversity will be completed on site, including planting tree and scrub to improve habitats for local animals in the wild. The developer has not stated when it expects the construction of the project to start or when it expects the Middleton Farm Bess to be connected to the British electricity grid.

Pete McLaren, head of the Scottish development at Qair UK, said that the project is a “milestone for Qair UK” as the company expands to independent energy storage. He added: “Battery storage is crucial to unlock the full potential of renewable energy sources in the UK, and we are proud to contribute to a more resilient and flexible energy system.”

Although this is the first permitted independent storage project of QAIR UK, the company has secured the building permit for more than 140 MW of PV energy plants in the past 18 months. These include the Strohadley ZonneboerderijA 49.9 MWP Solar PV energy plant in Buckinghamshire for which the building permit was granted in December last year.

See also  Legal challenge dropped, Sungrow and SSE plan BESS

Before that, September 2024 saw another important planning profit, because the company the planning state for the Lark Hill Solar Farm. The building permit for the development of 49.95 MW was granted by Rochford District Council, which is located on 66 hectares of land near Caneewdon, Essex.

At the end of August last year, Qair UK acquired a considerable part of the majority in Green Switch Capital. Green Switch Capital currently has a development frame of more than 15 GW, with his first projects that are expected to be put into use in the year 2026. Qair has a worldwide operational solar pipeline of more than 450 MW, with a specialty in Agrivoltaïschen (AgripV), in which solar energy generation and agricultural activities, including sheep growing, are co -co -co -co -co -co -co -grown



Source link

BESS lands permission Qair
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

Low-pressure hydrogen bridges seasonal gaps in Japanese solar-powered buildings – SPE

April 22, 2026

SolarEdge focuses on C&I with new all-in-one battery – SPE

April 22, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Solar energy saves Groton Public Schools in Connecticut $40,000 in energy costs

By solarenergyMay 23, 20240

Groton Middle School is one of two buildings in Connecticut’s Groton Public School district to…

Goldi Solar releases 665 W back-contact PV panel with an efficiency of 24.6% – SPE

October 30, 2025

Levels is launching a new platform to buy, Sell Renewable Assets – PV Magazine International

February 26, 2025

NeoVolta partners with PotisEdge and Longi to create BESS in Georgia

January 20, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Manufacturing partnership brings new PV technology to US solar

April 23, 2026

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026
Our Picks

Manufacturing partnership brings new PV technology to US solar

April 23, 2026

Tesla launches three-phase Powerwall 3P – SPE

April 23, 2026

Why the UK solar industry needs to own its safety story

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.