Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Bulgaria seeks to revive an 864 MW Chaira hydropower plant – SPE
Energy Storage

Bulgaria seeks to revive an 864 MW Chaira hydropower plant – SPE

solarenergyBy solarenergyApril 28, 2026No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

With support from Toshiba, Bulgarian utility NEK is working to restart its 864 MW Chaira pumped storage power plant, the largest of its kind in Southeastern Europe. The facility has been offline since March 2022 due to a turbine failure.

April 28, 2026
Emiliano Bellini

The Chaira hydroelectric power station

Image: Edal Anton Lefterov, Wikimedia Commons, CC BY-SA 3.0

Bulgarian state-owned company Natsionalna Elektricheska Kompania EAD (NEK EAD) has signed a memorandum of understanding with Toshiba International Europe Ltd., the British subsidiary of Japan’s Toshiba Corp., to restart operations of the Chaira pumped storage hydropower plant.

The facility is the largest of its kind in Southeastern Europe and is located in the Rhodope Mountains near the town of Devin. The installation was commissioned in phases between 1995 and 2010. The plant is equipped with four reversible Francis pump turbines, each with a capacity of 216 MW in generation mode and 197 MW in pump mode.

Units 1 and 2 were commissioned in 1995, making Chaira the largest pumped storage facility in South East Europe at the time. Units 3 and 4 were subsequently commissioned in 1999, completing the four-unit configuration.

“The Chaira Pumped Storage Hydroelectric Power Plant (PSHPP), the country’s largest, has an installed capacity of 864 MW across four units. However, due to aging infrastructure, some units are currently out of service, underscoring the urgent need for comprehensive rehabilitation and optimized plant-wide operations,” Toshiba said in a statement.

The plant was shut down in March 2022 after a serious turbine accident during post-rehabilitation testing of Unit 4. The Bulgarian Ministry of Energy stated that the main cause was material fatigue, combined with the original turbine design and cavitation effects.

See also  Edify Energy awards EPC contracts for 1.8 GW of solar energy and storage in Australia – SPE

“Toshiba has already been commissioned to carry out repair work on Unit 1 and will also carry out studies and provide technical support for the plant as a whole, including operational and maintenance support for Units 2, 3 and 4, as well as recommendations to improve the reliability and efficiency of key equipment such as pump turbines and generators,” the company added.

Toshiba supplied the turbine and generator with pumped storage for Unit 1 of the Chaira plant in 1994. His involvement later expanded to all four units. It also supplied four generators with a combined power of 940 MVA.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Bulgaria Chaira hydropower plant revive seeks SPE
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

British Solar Renewables wins call for 29 MW solar power plant

July 28, 2026

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026

The government sets targets for 5GW T-1 and 40.9GW T-4

July 27, 2026
Leave A Reply Cancel Reply

Don't Miss
Carbon Credit

Carbon Credit Questions? Our AI Tool Has The Answers!

By solarenergyApril 28, 20240

Environmental issues are one of the most pressing concerns for the safety and future of…

Burkina Faso set for 150 MW Solar-Plus-Storage Project-PV Magazine International

July 22, 2025

PV-powered system to desalinate water and produce H2 for desert agriculture – SPE

December 7, 2024

Solis introduces a new range of 1,500 V string inverters

August 27, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.