Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - India launches tender for 2 GW/8 GWh plus storage renewables – SPE
Energy Storage

India launches tender for 2 GW/8 GWh plus storage renewables – SPE

solarenergyBy solarenergySeptember 14, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Solar Energy Corp. of India (SECI) has started accepting bids for setting up 2 GW of renewable energy projects, backed by energy storage systems for a guaranteed peak supply of 8 GWh. Bidding closes on October 14.

September 13, 2024 Uma Gupta

Image: Avi Waxman, Unsplash

By pv magazine India

SECI is seeking bids from developers to set up 2 GW of renewable energy projects, supported by energy storage systems for a guaranteed peak supply of 8 GWh.

The projects are developed on a build-own-operate (BOO) basis. They can be located anywhere in India and must connect to the Inter-State Transmission System (ISTS).

The selection of 2 GW of projects will be done via e-bidding, followed by an e-reverse auction. Developers can bid for between 50 MW and 1 GW.

SECI will sign power purchase agreements (PPAs) for 25 years with the winning bidders. The power will be sold to various buyers across India.

SECI said in the tender documents that bidders with already commissioned renewable energy projects or projects under construction with uncommitted capacity can also participate in the Request for Selection (RfS) process. These bidders are eligible for longer PPA periods based on the time between the actual start date of power supply and the planned start date.

The selected developers will build ISTS-connected renewable projects with energy storage systems (ESS), including transmission infrastructure to the point of supply, to supply power to SECI. The ESS may be owned by the developers or come from third parties. The developers can also change the ESS technology at any time during the PPA term.

See also  Main collection restaurants of Smart Energy Week 2025 in Tokyo - PV Magazine International

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

GW8 GWh India launches Renewables SPE storage tender
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

British Solar Renewables wins call for 29 MW solar power plant

July 28, 2026

Ireland’s RESS 6 solar and wind auction includes NZIA criteria

July 28, 2026

The government sets targets for 5GW T-1 and 40.9GW T-4

July 27, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Caelux develops Perovskite-Silicon Tandem solar sun with four terminal configuration

By solarenergyApril 11, 20250

By PV Magazine USA Perovskites are expected to play a crucial role in the progress…

LG launches two new air-water-propane heat pumps for homes – SPE

August 14, 2024

JinkoSolar reports a net profit of $1 billion for 2023

April 25, 2024

Demand is driving up some European electricity prices – SPE

January 18, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.