Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - India launches tender for 2 GW/8 GWh plus storage renewables – SPE
Energy Storage

India launches tender for 2 GW/8 GWh plus storage renewables – SPE

solarenergyBy solarenergySeptember 14, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Solar Energy Corp. of India (SECI) has started accepting bids for setting up 2 GW of renewable energy projects, backed by energy storage systems for a guaranteed peak supply of 8 GWh. Bidding closes on October 14.

September 13, 2024 Uma Gupta

Image: Avi Waxman, Unsplash

By pv magazine India

SECI is seeking bids from developers to set up 2 GW of renewable energy projects, supported by energy storage systems for a guaranteed peak supply of 8 GWh.

The projects are developed on a build-own-operate (BOO) basis. They can be located anywhere in India and must connect to the Inter-State Transmission System (ISTS).

The selection of 2 GW of projects will be done via e-bidding, followed by an e-reverse auction. Developers can bid for between 50 MW and 1 GW.

SECI will sign power purchase agreements (PPAs) for 25 years with the winning bidders. The power will be sold to various buyers across India.

SECI said in the tender documents that bidders with already commissioned renewable energy projects or projects under construction with uncommitted capacity can also participate in the Request for Selection (RfS) process. These bidders are eligible for longer PPA periods based on the time between the actual start date of power supply and the planned start date.

The selected developers will build ISTS-connected renewable projects with energy storage systems (ESS), including transmission infrastructure to the point of supply, to supply power to SECI. The ESS may be owned by the developers or come from third parties. The developers can also change the ESS technology at any time during the PPA term.

See also  SSE Renewables announces partners for the 640MWh BESS project

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

GW8 GWh India launches Renewables SPE storage tender
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

UK government considers community grant for battery storage

June 5, 2026

UK CfD scheme provides optimism for the UK investment landscape

June 5, 2026

Nova commissions a 400kW floating solar project in Cheshire

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Beware of cleaning photovoltaic panels with detergent

By solarenergyMarch 31, 20260

Researchers in Finland found that dish soap reduces the permeability and performance of solar panels,…

British network software reduces quotes for MV solar connections to 15 minutes – SPE

February 27, 2026

Perovskite-silicon tandem solar cell treated with n-Butanol achieves an efficiency of 29.4% – SPE

June 11, 2024

Oman announces preferred bidders for 500 MW solar tender – SPE

June 27, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.