Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, July 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Changes to the BSC code support large energy storage facilities
Energy Storage

Changes to the BSC code support large energy storage facilities

solarenergyBy solarenergyDecember 12, 2024No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
Storage units with a capacity of more than 50 MW are normally licensed, meaning that until now they have not been allowed to set their production or consumption status in the way that smaller units can. Image: Alexon.

Elexon has amended the Balancing and Settlement Code (BSC) rules to reduce the financial exposure of large energy storage facilities.

The BSC establishes rules for trading in electricity and guaranteeing the stability of supply. It prescribes that each balancing mechanism unit (BMU) must have a production or a consumption status to ensure accurate allocation of energy flows.

Production means that a storage unit exports power and when it imports it is known as consumption. If that status changes unexpectedly, it could mean that operators are unable to fulfill the agreed electricity contracts, potentially impacting the system balance. Unexpected status changes also lead to unexpected imbalance charges.

This was originally intended to prevent integrated energy companies from exploiting vertical integration.

Because switching between the two can cause imbalances in utility bills and incur costs, Elexon has implemented BSC modification P475, “Allow all storage locations to set and repair their own production/consumption flags,” which means that storage BMU operators can set their production and consumption status. himself.

By nature, storage units can switch between importing and exporting power. Units under 50 MW can be registered on the supplier volume allocation market with the fixed status ‘Consumption’ or can be registered on the central volume allocation market as an individual BMU and marked as permit-free. This allowed them to identify their status as ‘Consumption’ or ‘Production’, preventing the BMU from ‘flipping’ between statuses and being charged.

Storage units with a capacity of more than 50 MW are normally licensed, meaning that until now they have not been allowed to set their production or consumption status in the way that smaller units can. With this new change, now they can.

See also  China completes first large-scale trial of underwater pumped storage at 65 m depth - SPE

The change was first proposed in June this year and in September Ofgem approved it for implementation in February 2025. Since its approval, Alexon has worked with third-party technology providers to bring forward the implementation date, with the rule change applying from December 10.

Ofgem approved the new implementation date on December 6, allowing storage administrators to take advantage of the change sooner.

Peter Stanley, CEO of Elexon, said: “Achieving the 2030 Clean Energy target will require a major increase in flexibility provision, and that includes the development of higher capacity storage facilities.

“There is an urgent need to implement rule changes quickly, and Elexon’s collaboration with industry to implement P475 in approximately six months is an example of the speed at which we must act to support participants.”

Source link

BSC code Energy facilities large storage support
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026

Prime Minister reduces VAT on electricity, appoints new energy secretary

July 21, 2026

The British Army commissions a 1.7 GWh PV project at Larkhill Garrison

July 21, 2026
Leave A Reply Cancel Reply

Don't Miss
News

A second life for lithium-ion batteries could propel future space missions

By solarenergySeptember 22, 20240

A second life for lithium-ion batteries could propel future space missions The use of lithium-ion…

A high energy density Mars battery designed for long-duration missions

September 30, 2024

Battery systems for apartments attractive after storm outages in São Paulo – SPE

October 22, 2024

67% of clean energy jobs in Appalachia are at risk

December 19, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026

SmartestEnergy, Greentech ink CfD PPA for the Kent solar project

July 22, 2026
Our Picks

Distributed solar capacity in Argentina grew by 34.5% in the first half of the year

July 23, 2026

The UK government has urged to ensure that plug-in solar is properly regulated

July 22, 2026

Cornwall Insight cuts price ceiling forecast after Burnham’s VAT cut

July 22, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.