Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Iberdrola plans 1.32 GW Pumped-Hydro Storage project in Portugal-PV Magazine International
Energy Storage

Iberdrola plans 1.32 GW Pumped-Hydro Storage project in Portugal-PV Magazine International

solarenergyBy solarenergyJuly 14, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Iberdrola started approval processes for a 1.32 GW pumped hydro storage project in Portugal. The Proyecto de Aprovechamiento Hidroeléctrico de Minhéu will be the largest facility of the country in its kind, once completed.

July 14, 2025
Pilar Sánchez Molina

Alto tâmega pumping station

Image: iberdrola

By PV Magazine Spain

Iberdrola has started the process of environmental effects (EIA) for the Minhéu Hydroelectric Power Project, a pumped storage facility with 1,320 MW installed capacity. If built, this would be the largest Pomphydro station in Portugal.

The Minhéu project was designed as a supplement to Iberdrolas Alto Tâmega Hydroelectric complex by increasing the energy efficiency and storage capacity of the system. It includes the construction of a reservoir in the Cumeada area on Monte de Minhéu, hydraulically linked to the Alto Tâmega -Dam. Iberdrola has exclusive rights to use the water resources of the Dam.

The planned reservoir does not draw from extra water basins. It will only work with water that is already a license for the Alto Tâmega reservoir.

The plant runs in reversible mode, using the height difference between the reservoirs for pumps and turbine operation. Iberdrola expects the project to add between 2500 GWH and 3,000 GWH annual output.

The project is open to public consultation from Friday to 3 July.

Iberdrola commissioned the Alto Tâmega Hydroelectric complex in 2023. Gouvães and Daivões have been in commercial operation since 2022.

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

See also  Canyon Solar installs 250 KW Modular PV -Dukelel in Australia - PV Magazine International at night

Popular content

Source link

Iberdrola International magazine plans PortugalPV project PumpedHydro storage
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

EirGrid identifies a shortage of energy capacity in Ireland

March 5, 2026

Arevon’s 430 MW Project Increased Missouri’s Solar Capacity by Nearly 50%

March 5, 2026

China’s 600 MW/2.4 GWh storage facility will be the world’s largest CAES site – SPE

March 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Mercedes unveils car with 20% efficient ultra-thin solar coating – SPE

By solarenergyOctober 21, 20250

Mercedes-Benz unveiled its first car prototype with a silicon-free, 20% efficient nanoparticle solar coating that…

Lightsource bp drops 300 MW solar project due to public opposition – SPE

January 20, 2025

How to measure solar cell vibrations in the vehicle -integrated photovoltaic with the vehicle

September 2, 2025

Fronius introduces external configuration skills for Gen24 -Omvolers

July 2, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026

Oleic acid anti-pollution coating for solar panels – SPE

March 5, 2026
Our Picks

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.