Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Ørsted unveils plans for a 320MW Yorkshire solar farm
News

Ørsted unveils plans for a 320MW Yorkshire solar farm

solarenergyBy solarenergyJanuary 21, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A map of the proposed Kingfisher development

International renewable energy developer Ørsted has announced proposals for a 320MW solar PV power plant in East Yorkshire.

The Kingfisher Solar Farm is proposed to be located five miles north of the town of Beverly. The project’s approximately 320MW capacity classifies the development as a Nationally Important Infrastructure Project (NSIP), meaning project developer Ørsted must obtain a Development Consent Order (DCO) from the Department for Energy Security and Net Zero (DESNZ).

If the plans are approved, the project is expected to be operational by the end of 2030 and have a duration of no less than 60 years. Ørsted has not yet indicated when an application for a DCO will be submitted.

The project proposals suggest that the solar PV power plant could use the same cable route as the already approved Hornsea 4 offshore wind farm, which is also being developed by Ørsted. This cable route would connect the Kingfisher project to the nearby Creyke Beck substation via an underground cable.

Public consultations will soon open for the proposed development, with local residents and businesses invited to share feedback online or in person between February 3 and March 9. Public presentations and events will also be held in local towns and villages during the consultation period.

Randall Linfoot, Ørsted Program Manager for Kingfisher, said: “Kingfisher Solar Farm will make a significant contribution to achieving the country’s ambitious plans to achieve net zero carbon emissions by 2050.

“If the project is approved, we will also deliver real benefits to the communities we work in, including increasing nature reserves and habitats around our solar array, and having a community fund that will deliver lasting, tangible benefits for local people. We will invest in local initiatives and engage small and medium businesses in the area to see how they can secure work through our supply chain.

See also  SERIS builds 22.1% efficient perovskite-silicon tandem solar cell based on double-sided polysilicon layers – SPE

“We look forward to sharing more details about our proposals with local residents and businesses through this consultation.”

This is not the only thing NSIP Ørsted is currently involved in. PS Renewables and Ørsted have formed a partnership to develop the proposed One Earth solar power plant in Nottinghamshire. The development will include a co-located battery energy storage system (BESS) and has already been approved for a 740MW export/import connection by National Grid. Public consultation for the project closed in July and a DCO application is expected to be submitted between January and March 2025.

Source link

320MW farm Ørsted plans solar unveils Yorkshire
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Türkiye will add 2.1 GW of solar energy in the first half of the year

July 30, 2026

Taiwan introduces new solar regulations for large buildings

July 29, 2026

British Solar Renewables wins call for 29 MW solar power plant

July 28, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Research shows that the degradation of solar panels in the 1980s and 1990s was much lower than expected – SPE

By solarenergyJanuary 30, 20260

SUPSI researchers found that six Swiss PV systems installed in the late 1980s and early…

New design specifications for sodium-ion batteries – SPE

January 21, 2026

‘I was hired during maternity leave’ – SPE

August 2, 2024

Solar cell manufacturers can learn from giant clams, Yale researchers claim

September 6, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.