Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Root-Power awarded permission for 40 MW/80mWh Rotherham Bess
Energy Storage

Root-Power awarded permission for 40 MW/80mWh Rotherham Bess

solarenergyBy solarenergyFebruary 26, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
A 3D render from the upcoming site. Image: Root-Power.

Battery Energy Storage System (Bess) Developer Root-Power has announced that it has been received a building permit for a Bess of 40 MW/80mWh in Rotherham.

The project, near Brinsworth, Rotherham, started early development in August 2024, as part of the bumper harvest of Root-Power of 40 BESS planning applications at that time. The project will be on a strip of land next to the M1 -Velweg, and although it was previously registered as “green space”, the site private ownership was not accessible to the public and was too small for any agricultural use; As such, the application was unanimously approved by the planning committee.

The location in addition to the highway also offers a considerable amount of noise research of the development. The development is also expected to yield a net profit of biodiversity of approximately 32.76% compared to the current basic line of the site.

A date for construction has not yet been revealed, but the root force has stated that it expects that it will be actively confirmed in mid -2028.

Neil Brooks, director of Root-Power, said: “We are delighted to announce that we have protected the building permit for a new site, this time our 40mw site in Brinsworth, Rotherham.

“Special mention must go to our origin team that has carefully selected an almost perfect location for this Bess project. Managing competing restrictions is always difficult when planning a project, so finding a suitable location in just one mile of the connection point in an urban area, without causing unacceptable noise or visual impact on sensitive receptors, is a real achievement . We are happy to see that the planning committee has supported our application unanimously, which is a real voice of trust in our process and team. “

See also  ABB and Gridbeyond Release Bess Energy Management Software

This is the fourth Root-Power of the planning, so far granted in 2025. Earlier this month the company received a building permit for a 34 MW/68MWH Bess in the Scottish Highlands, located in Dounreay on the north coast of Scotland, with a schedule connection, with a grid connection, with a grid connection, with a grid connection, with a grid connection, which has a schedule connection date of 2026. In January the company had also received permission for a 40MW/80mWH Bess in Selby, North Yorkshire, and recently received permission for a project in County Durham.

This means a strong start of 2025 after a very successful 2024 for the company, which ended with the allocation of the planning approval for a large new project in the Stadscentrum of Glasgow. The Broomlan Road Bess, a 50 MW/100MWH Bess, is now in construction and will be close to Ibrox Stadium in the city center.

Source link

awarded BESS MW80mWh permission RootPower Rotherham
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

Which developers are still wrong with battery risk – PV Magazine International

June 5, 2025

National Battery Storage Safety Standard to ‘speed up’ implementation

June 5, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Ternary organic solar cell based on dimerized small molecules achieves an efficiency of 18.12%

By solarenergyAugust 19, 20240

A team from the Southern University of Science and Technology in China has designed a…

Viessmann launches new heat pumps from residential air to Water-PV Magazine International

April 26, 2025

World Bank boosts Indian carbon market and green hydrogen with $1.5 billion boost • Carbon credits

July 3, 2024

a step forward in sustainable energy technology

January 15, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025
Our Picks

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.