Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - Second consultation round opened for 800 MW solar power plant
News

Second consultation round opened for 800 MW solar power plant

solarenergyBy solarenergyJanuary 11, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
“We believe that local communities have an important role to play in informing and influencing how our GNR Solar and Biodiversity Park proposals evolve,” said Mark Noone. Image: Unsplash.

Elements Green, a UK-based renewable energy developer, has launched the second phase of regulatory consultation for its 800MW Great North Road Solar and Biodiversity Park.

The solar power plant will also feature energy storage and has been renamed to reflect the focus on biodiversity which was a priority for the developer following local feedback in previous consultations. This second consultation phase runs until February 20.

“We believe that local communities have an important role to play in informing and influencing how our proposals for GNR Solar and Biodiversity Park evolve,” said Mark Noone, project director for the development.

“We are committed to delivering this project in a responsible manner and aim to consult as widely and effectively as possible, working with residents, businesses and community organizations to improve and strengthen our proposals as our plans for the project progress.”

Since plans were unveiled for the project, which is classed as a Nationally Important Infrastructure Project (NSIP) due to its capacity, Elements Green has worked with the RSPB, Sherwood Forest Trust, Nottinghamshire Wildlife Trust and the Trent Rivers Trust to ensure the nature benefits from development.

The partnership is the first of its kind in the solar energy sector. As Chris Hewett, CEO of industry body Solar Energy UK, said at the time of the announcement, the public sees the impact on nature as one of the biggest concerns surrounding large-scale solar energy development.

During the first phase of consultation in February 2024, communities consulted on the initial proposals expressed a strong desire to protect and enhance their natural environment. As a result, the developer has committed to dedicating 850 hectares of the site exclusively to positive ecological management.

See also  NEXTRACKER presents a new trunk connector for tanning on RE+

In late December, Elements Green revealed that when the GNR Solar and Biodiversity Park comes online, estimated to be in 2027, a flock of nearly 4,000 sheep will graze the solar park’s fields, which could increase to 9,000 once lambing begins.

The herd will be managed by local farmers Phil Weaver and Pete Wilson and will also serve as vegetation management, which Elements Green says will save the project £5 million in mowing costs over its 40-year lifespan.

The collaboration with Weaver and Wilson is intended to demonstrate how solar farms can coexist with agriculture. Agrivoltaic energy, the use of land for solar energy and livestock farming, has become an industry in itself as the addition of solar energy can provide a much-needed income stream for farmers.

Source link

consultation opened plant power solar
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

Letter from China’s PV Industry: Arctech wins 2.1 GW solar deal

June 5, 2026

ComEd starts a new energy pilot with a solar rebate on the roof of a brewery

June 5, 2026
Leave A Reply Cancel Reply

Don't Miss
Energy Storage

Trina plans a large 2,640 MWh battery for Western Australia – SPE

By solarenergySeptember 25, 20240

China’s Trina Solar has submitted plans to build a 660MW/2,640 battery storage facility in Kemerton,…

British solar company closed after defrauding elderly consumers – SPE

November 7, 2025

Clearway begins construction on California’s newest solar and storage project

August 26, 2024

Gianfororte Veto’s Montana Community Solar legislation

June 17, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.