Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, March 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Swiss consortium switches on vertical Zonne-Plus storage project-PV Magazine International
Energy Storage

Swiss consortium switches on vertical Zonne-Plus storage project-PV Magazine International

solarenergyBy solarenergyFebruary 19, 2025No Comments3 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

The Baumgarten Solar Project consists of a 366 kW mounted vertical PV array and a storage facility of 2.5 MW/3 MWh.

February 19, 2025
Pilar Sánchez Molina

A Swiss consortium has ordered an vertical PV-plus storage plant mounted on the ground on an area of ​​approximately 6,000 m2 in the municipality of Kaltbrunn, in the St. Gallen canton in Switzerland.

The consortium is formed by the Swiss timber company W. Rüegg AG, PV Consultancy Zenna AG and solar installer Helion Energy AG.

The PV system has an installed capacity of 366 kW and a battery storage capacity of 2.5 MW/3 MWh. The foundations of the screw were supplied by the German mounting system provider K2 and the inverters were supplied by SMA zonnet technology based in Germany. The batteries are from Catl Enerone in China.

The company that owns the country on which the project is located, W. Rüegg, explains that the facility is fully removable, so that the country can be used later for other purposes, such as agriculture. It is located on the industrial site of Baumgarten in the Fischhausen Industrial Center, which is undeveloped and is planned as a country for long -term business development.

“We have had two suddenly on the outskirts of the village for quite some time,” the company said in a statement. “Because one of the two suddenly was planned as a possible expansion of our company, but due to the long planning phases this would not be possible for another 15 years, we thought of how this country could be used in an intermediate manner. The photovoltaic planting project mounted on the ground is therefore a perfectly intermediate use. “

See also  BW ESS, Sungrow Energize 100 MW/331MWH Bramley Bess

The stored energy is currently being sold on the regulated market in Switzerland as part of the portfolio of the producer and distributor CKW, part of the AXPO group. When the company’s expansion project is built on the adjacent site, the energy will be used to deliver the company itself.

From the start, the developers of W. Rüegg AG have placed a great emphasis on a visually attractive construction, where optimum integration in the existing industrial environment plays an important role. As a result, the height of the photovoltaic system was kept as low as possible.

To prevent unnecessary sparkle, the solar panels are oriented to the south, have an anti-glare glass surface and are equipped with anti-glare edges. The entire system will be surrounded by a visually integrated fence.

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

consortium International magazine projectPV storage Swiss switches Vertical ZonnePlus
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

EirGrid identifies a shortage of energy capacity in Ireland

March 5, 2026

China’s 600 MW/2.4 GWh storage facility will be the world’s largest CAES site – SPE

March 4, 2026

Consultancy firm Amber Energy is entering administration

March 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Cummunity

GameChange Solar launches logistics assistant GeniusShip

By solarenergyFebruary 19, 20260

GameChange solar energy has launched a new logistics platform to streamline site receiving, improve materials…

Magellan launches Home Battery System – PV Magazine International

May 20, 2025

Span unveils new smart electrical panels for new and retrofit home construction

April 24, 2024

California Solar on Canals Initiative is moving forward

March 26, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026

How to address imbalance datasets in solar panel dust detection

March 5, 2026
Our Picks

Mitsubishi Electric Trane announces new heat pump line for hydronic heating – SPE

March 6, 2026

Origis is developing a 413 MW solar portfolio in West Texas

March 6, 2026

New Jersey expands state community solar program by 3 GW

March 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.