Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - News - TotalEnergies completes a 4.6 MW solar project for the California Water Agency
News

TotalEnergies completes a 4.6 MW solar project for the California Water Agency

solarenergyBy solarenergyJune 1, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

East Bay Municipal Utility District

TotalEnergies and the East Bay Municipal Utility District (EBMUD) have commissioned the Orinda Photovoltaic Solar Energy Project (Orinda PV), EBMUD’s largest solar facility. The 4.6 MW project, designed, built, owned and operated by TotalEnergies, will provide the non-profit water agency with approximately 10 million kWh of clean solar energy per year under a long-term PPA, significantly reducing EBMUD’s greenhouse gas emissions compensated. furthering the utility’s progress toward its goal of carbon neutrality by 2030.

“The Orinda PV project represents a leap in EBMUD’s clean energy production and supports our mission to provide safe and affordable drinking water while protecting the environment,” said EBMUD General Manager Clifford Chan. “We believe that investing in a sustainable future is the right thing to do for our customers and our planet, not just for today but for generations to come.”

East Bay Municipal Utility District

Orinda PV contains more than 12,000 high-efficiency panels, mounted on single-axis trackers, that maximize energy production on the 12-hectare site. The site’s landscaping includes vegetative screening that minimizes visibility of the PV system from nearby nature trails and the Briones Reservoir, a popular recreation area.

The Orinda PV project is expected to offset 10% of EBMUD’s current energy costs. The PV system will be connected to the local electric grid under PG&E’s Renewable Energy Self-Generation Bill Credit Transfer (RES-BCT) program, which allows the electricity generated by the project to offset the energy consumed by up to 50 of the EBMUD electricity bills with PG&E. The project’s location adjacent to PG&E’s Sobrante substation reduces the costs and impacts of interconnecting with the electric grid.

See also  Ashtrom Renewable Energy completes its first solar project in the US

News item from TotalEnergies

Source link

agency California completes project solar TotalEnergies water
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025

Until UK Solar Acquisition sites unveiled

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Policy

Trump Nixes Biden-Trade Solar Manufacturing Proclamation

By solarenergyMarch 20, 20250

The Trump Government has withdrawn an order under former President Joe Biden that the photovoltaic…

HD Hyundai to launch new TopCon modules at Re+

September 2, 2024

DMEGC releases bifacial solar panels of 440-460 W based on rectangular wafers at Intersolar – SPE

June 19, 2024

Ardian acquires akuo – PV Magazine International

March 25, 2025
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025
Our Picks

InensEnergy completes 250 MW Ohio Solar Project for Microsoft

June 6, 2025

Future housing stands on the roof Zonne -Zon will be mandatory

June 6, 2025

Aerocompact introduces tool-free PV mounting system

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.