Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, June 7
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Technology - Virtual power plant for renewable stable trade in development in Greece – PV Magazine International
Technology

Virtual power plant for renewable stable trade in development in Greece – PV Magazine International

solarenergyBy solarenergyApril 22, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Optimus Energy has announced a virtual power plant for renewable energy sources that act on the Greek wholesaler electricity and balancing market. The work is already underway, where Emsys VPP in Germany connects more than 3,500 solar and wind energy factories in Greece with its software suite.

April 21, 2025
Patrick Jowett

Image: Peter Franken, Unsplash

Athens with a headquarters Energy supplier Optimus Energy has contracted Germany’s Emsys VPP to deliver its virtual power plant (VPP) for the trading of renewable energy on the Greek wholesaler electricity and balancing market.

According to a statement from Optimus Energy, Emsys VPP has already started setting up its VPP for the electricity market, a process that includes connecting more than 3,500 solar and wind energy plants in Greece.

The installed renewable energy portfolio of Optimus Energy reaches almost 4 GW, equal to 50% of the renewable energy capacity of Greece that is traded under the feed-in premium schedule or by direct trading participation.

The VPP includes solar and wind energy for predispositions for the connected assets of Emsys VPP’s Partner Company, Energy & Meteo Systems. Emsys VPP also provides a tailor -made VPP package that will offer balance services that aim to benefit both the renewable assets, by creating an extra income flow and the grid by providing greater flexibility.

The VPP will also make the qualification of renewable assets possible for participation in the market for balancing services via external control tests that ensure that assets meet shipping instructions from the Greek transmission system operator IPTO.

See also  New model for predicting residential PV fleet yield - PV Magazine International

Optimus Energy says that the software suite will enable its portfolio to manage its portfolio efficiently, including the reduction of power generation during periods of negative electricity prices, while the value of the portfolio on the energy markets is also maximized in the short term.

Stella Zacharia, CEO of Optimus Energy, said that the collaboration will play an important role in optimizing the market potential of the business portfolio. “We are pleased to play a crucial role in improving the stability of the energy system in Greece, while also have access to the emerging market for terrifying services as a valuable extra income flow for our growing portfolio of renewable energy,” Zecharia added.

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

development Greece International magazine plant power renewable stable trade virtual
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Aura Power secures financing for 49.9 MWp Staffordshire PV project

June 4, 2026

Video: Understanding Safe Harbor Programs | Power forward!

June 3, 2026

Renewable energy auction to exclude Gate 1 projects, AR8 timeline announced

June 3, 2026
Leave A Reply Cancel Reply

Don't Miss
News

Pivot Energy, University of Denver completes Colorado’s first virtual net-metered solar project

By solarenergyFebruary 1, 20260

Turn energya national renewable energy provider headquartered in Denver, and the University of Denver (DU),…

Energy expenditure for data centers competes with global investments in solar energy – SPE

April 9, 2026

Waaree Energies receives an order for 1 GW of solar panels

December 12, 2024

Solar Roads – Paving the Future (2024)

October 25, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.