Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Sunday, September 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Austria’s Andritz will supply a 500 MW South Korean pumped storage power station – SPE
Energy Storage

Austria’s Andritz will supply a 500 MW South Korean pumped storage power station – SPE

solarenergyBy solarenergyJanuary 22, 2026No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Austrian engineering group Andritz has signed an agreement to supply the pumped turbine units for a 500 MW pumped storage facility in South Korea, the country’s first new pumped storage project in more than a decade.

January 22, 2026
Patrick Jowett

Rendering of the new pumped storage installation

Image: Korea Hydro & Nuclear Energy

By ESS news

Austrian technology group Andritz has been selected by South Korean industrial company Doosan Enerbility to supply its turbine units for the pumped storage plant in Yeongdong.

The 500 MW Yeongdong project, which will be built in South Korea’s southwestern Chungcheong province, is a partnership between Doosan Enerbility and the country’s largest electric utility, Korea Hydro & Nuclear Power (KHNP). It is the first large-scale pumped storage project initiated by KHNP since 2011.

According to local press reports, a groundbreaking ceremony for the project took place last April. At the time, it was announced that the factory would be built on a site of 1.18 million square meters, with a project cost of more than KRW 503 billion ($343 million).

Andritz will be responsible for the design of two pump turbines, motor generators and related auxiliary equipment and the supply of key components of the pump turbines and motor generators, as well as the digital control system, turbine controllers and protection systems. The company will also provide installation supervision and commissioning services.

To read further, visit our ESS news website.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

See also  Toshiba unit launches EneHub platform to support renewable transactions – SPE

Popular content

Source link

Andritz Austrias Korean power pumped South SPE Station storage supply
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Georgia Power cuts the ribbon on the Moody Battery Facility

July 29, 2026

British Solar Renewables wins call for 29 MW solar power plant

July 28, 2026
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

Jinkosolar complains what energy for alleged topcon -trick fracture

By solarenergyFebruary 12, 20250

Jinkosolar has brought a lawsuit in Texas against where Energies and his American subsidiary for…

Floating solar panels could advance U.S. energy goals

January 15, 2025

Low carbon signs PPA -Deal, Metlen scores EPC contracts

July 25, 2025

Research shows that some countries can meet their electricity needs with floating solar panels

June 5, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026

What Counts For Scope 3 Targets

August 12, 2026
Our Picks

Sol Systems adds to project portfolio with Texas acquisition | Projects Weekly

August 31, 2026

Climate-Linked Supply Chain Risk Is Already In Your P&L

August 26, 2026

Drake Plastics gets new carport project near Houston | Projects Weekly

August 17, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.