Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Monday, June 8
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Batteries replace diesel backup at wastewater plant in New York – SPE
Energy Storage

Batteries replace diesel backup at wastewater plant in New York – SPE

solarenergyBy solarenergyFebruary 28, 2026No Comments4 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

Viridi batteries have been deployed in New York to replace diesel generators, accelerating a trend of batteries replacing and supplementing generators of all sizes.

February 27, 2026
John Fitzgerald Weaver

By pv magazine USA

Viridi replaced a diesel backup generator with a battery system at a municipal wastewater pumping station in Erie County, New York. Depending on the pump demand, the amount is 150 kWh RPSLink system can supply power for 32 to 90 hours.

The $130,000 lithium-ion nickel-manganese-cobalt battery system is custom designed to meet the energy needs of the on-site pumps. Viridi specifically noted that high inrush current situations (when machines turn on and immediately require large amounts of power to physically move components) can strain batteries and require maintenance to ensure they don’t overheat or burn out.

Viridi estimates that annual site and generator maintenance costs, such as fuel management, testing and maintenance, range from $8,000 to $15,000 per site. The company says Erie County is considering implementing nearly 100 similar pumping facilities.

Viridi’s system can be monitored and tested remotely, while generators require operators on site. If 100 locations were replaced, it would cost anywhere from $800,000 to $1.5 million in savings per year, including many hours of human driving around the city.

The $130,000 battery system receives a 40% tax credit under the 48E Inflation Reduction Act due to the domestic content of the batteries, which has a net cost of $78,000. The system has a lifespan of twenty years if it is not running continuously, as is the case with this backup installation. Viridi guarantees 4,000 full charge-discharge cycles before the battery can degrade to 80% of its original capacity.

See also  Lightsource bp obtains construction permit for 57MW standalone BESS

Viridi provided pv magazine USA with the RPSLinkIN User Manual and the single line drawing of the Erie County installation shown above.

In Yucaipa, California, one of the nation’s largest water treatment and pumping facilities is nearing completion of a massive solar energy storage facility that will integrate grid-tied gas generators. In addition to cleaning up their electricity, Yucaipa Valley Water District (YVWD) facilities are essentially decommissioning multiple backup diesel generators at its two main locations.

The solar, storage and gas network backup virtually guarantees that the facility will never fail in the fire-heavy, high-risk and semi-arid region of California. The water treatment and pumping facilities serve more than 50,000 residents and the businesses they run. If the water treatment plant is out of action long enough, it can take thirty days before the plant is operational again.

The new energy system is dimensioned in such a way that the water can remain moving for at least 72 hours, solely on solar energy and storage. Hypothetically, if the smoke associated with grid shutdowns due to bushfires reduces solar energy output, the grid-connected generators can run the facility and charge the batteries at the same time.

The YVWD has also worked with Tesla to electrify their distributed water pumps and like Erie, New York, they have retired many small-scale diesel generators.

Residential solar and storage projects also integrate generators. BD Electric, a residential installation company in Massachusetts, recently installed an Enphase residential solar system using three of the company’s 5 kWh batteries. The system integrated the customer’s existing 20 kW Generac generator.

See also  Vikram Solar's PowerHive unit launches VION lithium batteries in India – SPE

Using the Enphase controller system, the installation is designed so that the house can initially run on solar energy, if available. Then the house will use the energy stored in the batteries. The generator is switched on when both the solar energy and the batteries are not sufficient to keep the control system running.

A key feature of the Enphase Envoy system is that the generator can simultaneously power the home and charge the battery. This allows the generator to work more efficiently, and once it is fully charged, the batteries can take over and shut down the fuel-burning machine.

This content is copyrighted and may not be reused. If you would like to collaborate with us and reuse some of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

Backup batteries diesel plant replace SPE wastewater York
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

UK government considers community grant for battery storage

June 5, 2026

UK CfD scheme provides optimism for the UK investment landscape

June 5, 2026

Nova commissions a 400kW floating solar project in Cheshire

June 4, 2026
Leave A Reply Cancel Reply

Don't Miss
Residential

Can I add more solar panels to my system in the future? (2024)

By solarenergyAugust 30, 20240

Thinking About Adding More Solar Panels? Here’s What You Need to Know As global awareness…

Pexapark registers 29 European PPAs for 1,227 MW in October – SPE

November 27, 2024

Astronergy launches 750W anti-dust TOPCon solar panel

December 13, 2025

Westminster approves an 800MW solar farm in Lincolnshire

April 8, 2026
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026

‘Come out from behind your screen, our industry is ultimately about people’

June 6, 2026
Our Picks

Dutch solar owners asked to switch off during peak periods to ease the distribution crisis

June 7, 2026

The hydrogen flow: Toyota demonstrates its racing prototype on liquid hydrogen

June 7, 2026

Era of electrification exposing Australia’s weakest link

June 6, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.