Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Friday, June 6
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - China Huadian is starting to work on 19.24 GW Wind-Solar-Coal-Storage Project-PV Magazine International
Energy Storage

China Huadian is starting to work on 19.24 GW Wind-Solar-Coal-Storage Project-PV Magazine International

solarenergyBy solarenergyMarch 5, 2025No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email

China Huadian started building a 19.24 GW Wind-Solar-Coal-Storage project in the province of Qinghai in China. The $ 11 billion project delivers 36.5 TWH electricity per year to the province of Guangxi.

March 5, 2025
Vincent Shaw

China Huadian Corp. Construction of the largest and highest integrated energy basis in Golmud, the province of Qinghai. The project, with a total investment of approximately CNY 80 billion ($ 11 billion), will have the highest share in the renewable capacity in a hybrid energy system designed to export electricity to provinces.

The project will have a totally installed capacity of 19.24 GW, with wind and solar energy that make up 85% of that capacity. The wind and photovoltaic installations will cover approximately 3000 square kilometers of dry, saline solution and rocky terrain. Although Huadian did not announce the exact breakdown, a branch source did not say PV -Magazine That the renewable capacity is greater than 14 GW.

To balance fluctuations of intermittent renewable energy sources, the project includes a large-scale battery energy storage system (BESS), usually 10-15% of the renewable capacity, together with four 660 MW Ultra-Superkruise coal units approved by the Qinghai Development and Reform Commission.

These plants will have indirect air cooling, the des sulfuration of wet flue gas and denitrification systems, supported by a special railway line and a 750 kV station. The thermal component is expected to cost CNY 11.5 billion.

State Grid Corp. From China, an ± 800 kV Ultra-Hoog voltage (UHV) develops direct power transfer line, the “Qinghai-Guangxi UHV DC project” to transfer power with a capacity of 8 GW. The project supplies 36.5 TWH of clean energy to Guangxi annually, the relief of regional power shortages and meeting 14% of the electricity needs of the province 2024.

See also  320MW/640MWh battery to complement the compressed air storage project in the Netherlands – SPE

Huadian said it aims to complete the project by 2027, after a synchronized development approach that integrates the renewable generation, shipping capacity and transmission infrastructure.

The energy basis will also serve as a national research platform, aimed at integrated energy systems, multi-energy complementarity and digital applications in large-scale energy hubs. Additional research will focus on desert control and ecological recovery, to support the sustainability of China and environmental goals.

This content is protected by copyright and may not be reused. If you want to work with us and reuse part of our content, please contact: editors@pv-magazine.com.

Popular content

Source link

China Huadian International magazine projectPV starting WindSolarCoalStorage work
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025

‘I wish I had known before that Impostor syndrome is customary’ – PV Magazine International

June 6, 2025
Leave A Reply Cancel Reply

Don't Miss
Solar Industry

US authorities detain solar panels imported from Mexico

By solarenergySeptember 5, 20240

Module manufacturer Maxeon says U.S. Customs and Border Protection officials have detained all of its…

More H2 projects suspended – SPE

October 22, 2024

Balance Power to accelerate the 2036 grid connection for 99MW BESS

September 24, 2024

Fraunhofer IMWS develops methodology for better lifespan predictions of inverters – SPE

October 22, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025

‘I wish I had known before that Impostor syndrome is customary’ – PV Magazine International

June 6, 2025
Our Picks

Aerocompact introduces tool-free PV mounting system

June 6, 2025

EDF taps Wärtsilä for two more British battery storage projects

June 6, 2025

New pollution room for testing dust structure in solar modules – PV Magazine International

June 6, 2025
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2025 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.