Close Menu
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
What's Hot

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
Facebook X (Twitter) Instagram
Facebook X (Twitter) Instagram
Solar Energy News
Thursday, April 23
  • News
  • Industry
  • Solar Panels
  • Commercial
  • Residential
  • Finance
  • Technology
  • Carbon Credit
  • More
    • Policy
    • Energy Storage
    • Utility
    • Cummunity
Solar Energy News
Home - Energy Storage - Sungrow partners with SSE Renewables for 320MW BESS
Energy Storage

Sungrow partners with SSE Renewables for 320MW BESS

solarenergyBy solarenergyAugust 21, 2024No Comments2 Mins Read
Facebook Twitter Pinterest LinkedIn Tumblr Email
Share
Facebook Twitter LinkedIn Pinterest Email
The project will be able to provide half a million households with emergency power. Image: Sungrow

Sungrow has signed a supply agreement with SSE Renewables for a major battery energy storage system (BESS) project in Yorkshire.

Sungrow, a manufacturer of PV inverters and energy storage systems, has agreed to supply SSE Renewables with 320MW/640MWh of PowerTitan liquid-cooled BESS units for its Monk Fryston project in the north of England. Once completed, this project will be connected to the UK electricity grid at the highest voltage level, increasing the flexibility of the electricity grid in the local area.

The PowerTitan units are specially designed to expand grid flexibility. They use specialized “Stem Cell Grid Technology” that allows the BESS to effectively balance grid loads through fast frequency and voltage regulation and dynamic harmonic suppression.

James Li, Director of ESS at Sungrow Europe said: “With the increasing importance of energy storage, Sungrow is continuously improving its energy storage technology to provide customers with efficient, reliable and secure energy storage systems. These systems can effectively and efficiently support grid stability and stimulate further progress in renewable energy sources. PowerTitan’s industry-leading network tracking and grid-forming capabilities also laid the foundation for the successful execution of this project.”

This is not the first time that SSE Renewables and Sungrow have collaborated on a BESS project; Sungrow supplied 136 units for SSE Renewable’s BESS project in Ferrybridge, West Yorkshire, with an installed capacity of 150MW/300MWh. The project, which started construction in August 2023 and will be completed later this year, is three times the size of SSE’s current flagship site in Salisbury, Wiltshire.

Another leap forward for SSE

SSE Renewables has made tremendous progress in the energy storage sector in recent months.

See also  PULS CLEAN ENERGY ENERGISES 30MW/67MWH BESS

Last week the company announced that exploratory tunneling for its Coire Glas project had been completed, marking a major milestone in Britain’s first large-scale pumped hydro energy storage (PHES) system in four decades.

When completed, the Coire Glas storage development will have an installed capacity of 1,300 MW and be capable of delivering 30 GWh of long-term electricity storage.

SSE Renewables is also developing another PHES project in Loch Fearna, Scotland. The 1.8 GW Loch Fearna project has already received a grid connection offer for 1.795 GW and is expected to commence commercial operation in mid-2030.

Source link

320MW BESS partners Renewables SSE Sungrow
Share. Facebook Twitter Pinterest LinkedIn Tumblr Email
solarenergy
  • Website

Related Posts

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

Low-pressure hydrogen bridges seasonal gaps in Japanese solar-powered buildings – SPE

April 22, 2026

SolarEdge focuses on C&I with new all-in-one battery – SPE

April 22, 2026
Leave A Reply Cancel Reply

Don't Miss
Technology

Enphase on how distributed energy assets can boost data centers – SPE

By solarenergyJanuary 20, 20260

As demand for data centers increases and home batteries evolve from backup power to grid…

NexPracker acquires PV -panel frame manufacturer Origami Solar

September 15, 2025

EU introduces secondary legislation for Net-Zero Industry Act

May 23, 2025

1.2 TW of electrolyzers under development worldwide – SPE

April 27, 2024
Stay In Touch
  • Facebook
  • Twitter
  • Pinterest
  • Instagram
  • YouTube
  • Vimeo
Our Picks

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026

The federal court has halted Trump administration orders that hinder solar and wind energy development

April 23, 2026
Our Picks

Why the UK solar industry needs to own its safety story

April 23, 2026

Fraunhofer ISE develops colored film technology for patterned solar panels

April 23, 2026

Thermoacoustic heat pumps are on the verge of commercial breakthrough – SPE

April 23, 2026
About
About

Stay updated with the latest in solar energy. Discover innovations, trends, policies, and market insights driving the future of sustainable power worldwide.

Subscribe to Updates

Get the latest creative news and updates about Solar industry directly in your inbox!

Facebook X (Twitter) Instagram Pinterest
  • Contact
  • Privacy Policy
  • Terms & Conditions
© 2026 Tsolarenergynews.co - All rights reserved.

Type above and press Enter to search. Press Esc to cancel.